Although Hastings Asphalt Services will call the underground utility locating services as needed, any permits are your responsibility.
When you talk to us, please notify our sales consultant regarding any underground items in the drive area, such as pet fences, sprinkler lines, buried conduit, etc.
Also, let us know if there are any other fragile items in the area.
What time of the year can my new driveway or parking lot be installed?In Illinois and Wisconsin, weather plays a big role in the asphalt industry. The typical paving season starts in April when the temperatures are steadily above freezing and the frost in the ground has thawed. Our season ends in November when the cold weather moves in to stay.
How long will an asphalt driveway last?
The typical asphalt driveway can last up to 20 years. An important factor in the longevity of a blacktop driveway is the stability of the base and the quality of the asphalt mix. We use only state-approved asphalt mixes.
How long will it take to install a new driveway?
The typical driveway requires two days of on-site work. The first day is for preparation (removal, grading, etc.) and the second day is when the hot asphalt will be paved. The whole process could take a couple of days or up to a few weeks, depending on schedules, weather and/or other factors.
When can my driveway be driven on after construction starts?
Once the prep work is complete, most drives will allow for light automobile traffic until paving starts. After paving is complete, it is recommended you keep all car traffic off of the new asphalt for at least 24 hours or even longer during warmer temperatures.